Facility Schematic: Containment Chamber 4-C
Chamber 4-C was built in 1983 and decommissioned in 1987. Interior surfaces were poured in a single continuous pass: no seams, no fixtures, no right angles at floor level. This was the Institute's first guess, and it was wrong.
Doors carry their own resonant frequency. That was never the problem. The problem was .
The walls were held at a continuous for four years, tuned to cancel the frequency rather than contain it.
Staff were rotated out at six weeks. Longer postings produced , and what the medical files call .
Status: .
Released in part under the Pacific Northwest Acoustic Preservation Act. Withheld text is withheld for your safety. If you hold a release code for this record, enter it in the interactive archive. All records.
